Umusadege Field Development (OML56)

SunTrust Atlantic and its JV partner produced first oil from the Umusadege Field in 2008. We are actively working to mature other drilling prospects within the Umusadege Field towards increasing our oil production.

Umusadege Field Development (OML56)

SunTrust Atlantic and its JV partner produced first oil from the Umusadege Field in 2008. We are actively working to mature other drilling prospects within the Umusadege Field towards increasing our oil production.

To enable crude processing and storage, SunTrust Atlantic and its JV partner designed, built and commissioned a state-of-the-art central processing facility (“CPF”) capable handling approximately 40,000bopd as well as a 110,000-barrel capacity tank farm to mitigate against downtime and production losses from pipeline outages.

The Umusadege Field exports crude oil via two export pipelines – TransForcados Pipeline, connected by the Umugini Pipeline and the AGIP Export Pipeline (Brass River Terminal).  The Umugini Pipeline, commissioned in 2014, is a 51.4kmx12” pipeline with a design capacity of 45,000bopd per day is co-owned by SunTrust Atlantic.

The JV’s ability to export oil from two independent oil export terminal significantly reduces the risk of oil production shut-in due to pipeline down time.
Please see our Latest News section for updates on our field operations.

Operations News

FIELD OPERATIONS UPDATE

FIELD OPERATIONS UPDATE

Production SunTrust Oil and its partner have increased oil production from 14000Bopd to 16000 BOPD through various well intervention activities. Further intervention jobs on the existing Umu 7 and Umu 10LS are expected to further increase the production numbers in the...

JANUARY 2018 – OPERATIONS UPDATE

JANUARY 2018 – OPERATIONS UPDATE

DRILLING No current drilling operation. Plans are ongoing to carry-out rig-less interventions on some of the well strings. PRODUCTION ACTIVITIES SunTrust Oil and its partner, sustained production operation during the month, December 2017, under review. Plans are...

SEPTEMBER 2017 – OPERATIONS UPDATE

SEPTEMBER 2017 – OPERATIONS UPDATE

   DRILLING No current drilling operation. Plans are ongoing to carry-out rig-less interventions on some of the well strings.  PRODUCTION ACTIVITIES SunTrust Oil and its partners, sustained production operation during the month, September 2017, under review....

AUGUST 2017 – OPERATIONS UPDATE

AUGUST 2017 – OPERATIONS UPDATE

DRILLING No current drilling operation. Plans are ongoing to carry-out rig-less interventions on some of the well strings. PRODUCTION ACTIVITIES SunTrust Oil and its partners, sustained production operation during the month, August 2017, under review. Plans are...

JULY 2017 – OPERATIONS UPDATE

JULY 2017 – OPERATIONS UPDATE

DRILLING No current drilling operation PRODUCTION ACTIVITIES SunTrust Oil and its partners, sustained production operation during the month, July 2017, under review. Plans are ongoing to ramp up production as reserve production capacities (RPC) with NAOC and Shell...

Operations Update

Operations Update

DRILLING The UMU 16 well has been successfully drilled and completed. The UMU 16 well is the first well to be drilled on the western location of the field. The well has since been put in production with a combined production of about 6000 barrels of oil per day...

The UMU 16 Drilling

The UMU 16 Drilling

DRILLING The UMU 16 well has been successfully drilled and completed. The UMU 16 well is the first well to be drilled on the western location of the field. The well has since been put in production with a combined production of about 6000 barrels of oil per day...