Niger Republic Oil Exploration Project – Tounfalis Block

Niger Republic Oil Exploration Project – Tounfalis Block

A Production Sharing Contract was signed with the Niger Republic Government in August 2014 over a Licences area covering 3,791 square kilometres. Available geophysical data has defined existence of a graben (a depression flanked by parallel fault lines) with a limestone cap at a depth of approximately 3,000 metres.
SunTrust Atlantic has planned a 3D seismic survey and exploration drilling program Tounfalis Block.

Operations News

OPERATIONS UPDATE

OPERATIONS UPDATE

DRILLING No ongoing drilling activities. Preparation/planning for various well intervention works ongoing. PRODUCTION ACTIVITIES SunTrust Oil and its Partners have continued to reap the benefit of increased storage space at the Umusadege field. With about 110,000...

OPERATIONS UPDATE

OPERATIONS UPDATE

DRILLING No ongoing drilling activities. Preparation/planning for various well intervention works ongoing. PRODUCTION ACTIVITIES SunTrust Oil and its Partners have continued to reap the benefit of increased storage space at the Umusadege field. With about 110,000...

May 2020 OPERATIONS UPDATE

May 2020 OPERATIONS UPDATE

DRILLINGNo ongoing drilling activities. Preparation/planning for various well intervention works ongoing. GAS LIFT OPERATIONS: SunTrust Oil and its partners are making a lot of progress with the planned gas lift operation. The gas lift flowlines are almost completed,...

JANUARY 2020 OPERATIONS UPDATE

JANUARY 2020 OPERATIONS UPDATE

DRILLING No ongoing drilling activities. Preparation/planning for various well intervention works ongoing. PRODUCTION ACTIVITIES SunTrust Oil and its Partners have continued to reap the benefit of increased storage space at the Umusadege field. With about...

UMU-18 WELL DRILLING AND COMPLETION

UMU-18 WELL DRILLING AND COMPLETION

SunTrust Oil and its JV Partner completed the drilling and completion of Umu - 18 on the Western culmination of the Umusadege field to a total depth (TD) of 9,583ft and cored from 9,253ft – 9,314ft MD (61ft) on the 4th of October 2019. Umu-18 was completed as a dual...

UMU 18 WELL UPDATE

UMU 18 WELL UPDATE

SunTrust Oil and its JV Partner have completed the drilling and completion of Umu 18 on the Western culmination of the Umusadege field to a total depth (TD) of 9,583ft and cored from9,253ft – 9,314ft MD (61ft). Umu 18 was completed as a dual string multi-zone producer...

Inspection visit by SunTrust Oil MD/CEO

Inspection visit by SunTrust Oil MD/CEO

CEO/MD, SunTrust Oil Company Nigeria Limited, Mr. Ugo Okafor inspecting the Umusadege facilities Recently the MD/CEO of SunTrust Oil Company Nigeria Limited , Mr. Ugo Okafor, visited the Umusadege Field for the regular Management Facility Inspection exercise. Part of...

UMU WEST 2 DRILLING UPDATE

UMU WEST 2 DRILLING UPDATE

Completed drilling first section to TD at 4556ft and ran and cemented 13 3/8 casing. Currently performing cement top up job; later to drill out shoe, do a leak off test, pull out and pick up the Bottom Hole Assembly for the next drill section. The well will target...

UMU WEST 2 DRILLING UPDATE

UMU WEST 2 DRILLING UPDATE

Rig move and rig up is 100% complete. Rig acceptance test also 100% completed. Umusadege-West 2 (Umu 18) spudded at 13:00hrs on August 3, 2019. The well will be drilled as a deviated well in the western culmination with sands XXa & XIV as primary targets. The well...

UMU WEST 2 DRILLING UPDATE

Rig move to the Umusadege location is now expected to commence on July 12, 2019. Umusadege‐West 2 will be drilled as an S‐shaped well in the Western culmination with sands XXa & XIV as primary targets. The well will be completed as a dual string multi‐zone...